Ahmed Gouda Khalil
Career Objective
January 2013 –
May 2018
Employer: TISS Electromechnical Company.
Employer Address: Abu Dhabi – UAE.
Job title: Project Manager.
Job Description
Reference Projects
The project objective:
The objective of the project is to develop a technical solution to implement a Common Seawater
Treatment Facility (STF) for the Zubair, Rumaila, West Qurna 1, West Qurna 2, and Majnoon oil
fields in Southern Iraq. Each of these oil fields required water injection to ensure proper oil
reservoir maintenance and maximize oil recovery.
The scope of work:
The project objective:
Due to scarcity of water resources in the Gulf countries and the world, most of the GCC
countries tended to use treated sewage effluent (TSE) as an alternative to drinking water in the
district cooling plant. So The project objective is to develop the process design concepts for
TSE-Polishing plant shall be installed to meet water quality required by district cooling plant.
The scope of work:
Plan,design, procure, construct, install and commission a polishing plant (capacity=6,600 m3
/day)
which include ultra-filtration (UF) and reverse osmosis (RO) with all related equipments.
March 2012 –January 2013
Employer: Kadhema Scientific Consultancy and Service (KSCS) Co.
Employer Address: Kuwait State.
Job title: Senior Process Engineer.
Job Description
Reference Projects
The project objective:
The objective of the project is to treat the industrial wastewater produced from beverage
factories using Sequence Batch Reactors (SBR) technology to meet the criteria of the treated
wastewater discharged into the sewerage system.
The scope of work:
Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m3
/day and all related equipments.
Project: Industrial wastewater Treatment Plant with capacity = 1500 m3
/day.
Location: Subhan industrial area – Kuwait city – Kuwait.
Client: AMERICANA – Kuwait.
EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.
The project objective:
The objective of the project is to treat the industrial wastewater produced from Bakeries and
Meat factories using Dissolved air flotation (DAF) technology with extended aeration system to
meet the criteria of the treated wastewater discharged into the sewerage system.
The scope of work:
Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m3
/day and all related equipments.
July 2008- March 2012
Employer: KCC Engineering and contracting company (KCCEC) Employer
Address: Kuwait State.
Job title: Senior Process Engineer
Job Description
Reference Projects
The project objective:
Nov.2004 – July 2008
Employer: Egyptian Sugar and Integrated Industrial company (ESIIC) Employer
Address: Giza, Egypt.
Job title: Process Engineer.
Job Description
Reference Projects
Project: Qus Cane Sugar Factory.
Location: Qus city – QENA Governorate – Egypt
Owner: Egyptian Sugar and Integrated Industrial company (ESIIC).
The project objective:
The project objective to produce white or brown sugar from cane sugar using sugar factory with
capacity of 1500 ton of white/brown sugar and bi-products such as Molasses and Bagasse.
The scope of work:
Operate and maintain cane sugar factory to produce white/brown sugar according to the design
criteria and equipment datasheet.
May 2000 – Oct. 2004
Employer: SYSTEM TECHNIQUE – Water Management.
Employer Address: Giza, Egypt.
Job title: Operation and Process Engineer.
Reference Projects
Project: Reverse Osmosis (RO) plant with capacity 2,000 m3
/day.
Location: SONESTA Beach resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: SONESTA Resorts and Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,000 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 1,500 m3
/day.
Location: HYATT REGENCY resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: HYATT REGENCY Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 1,500 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 2,500 m3
/day.
Location: Mövenpick Resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: Mövenpick Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,500 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 800 m3
/day.
Location: HYATT REGENCY resorts – Taba City – South Sinai Gov. – Egypt.
Client: HYATT REGENCY Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 800 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Educational Details
B.Sc. Of Chemical : 1999 South Valley university, Egypt. First Class (72.5%)
Job location: Any Country
Job Category : Process and Operation for Water / Waste Water Treatment plants.
Employment Type : Permanent / Contract.
Employment Status : Full Time
Current location : Egypt
Driving License: UAE driving license (Valid upto: 2022)
Computer skills :
1. Microsoft Office.
2. AUTO CAD.
Significant Skills
Personal Information
Project: Al JAHRA wastewater treatment plant (Capacity= 120,000 m3
/day).
Location: Amgarah area – Jahra city – Kuwait.
Client: Ministry of Public Work (MPW) – Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and attached
activated sludge according to the design standards and criteria of the treated sewage effluent
used in irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 120,000 m3
/day.
Project: Al REKKA wastewater treatment plant (Capacity= 250,000 m3
/day).
Location: AL AHMADI city – Kuwait.
Client: Ministry of Public Work (MPW) – Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and attached
activated sludge according to the design standards and criteria of treated wastewater used in
irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 250,000 m3
/day.