Ahmed Khalil

EMPLOYMENT

Ahmed Gouda Khalil

Curriculum Vitae

Career Objective

A Stimulating and Rewarding career with good growth prospects in Engineering and Industries
to Coordinate with all activities of water and Waste Water treatment Plant by using my Technical
and Practical knowledge.

CAREER
HIGHLIGHTS
& Experiences

Highly experienced and skilled in the water and wastewater treatment plants design, installation,
operation and maintenance to support project conceptual level, Planning stage, execution stage
to the project close-out.
The experience encompasses of the following scope of works:
• Design, Install, Commission, Operate and maintain water treatment plant such as:
Reverses Osmosis (RO), Ultra-Filtration, TSE-Polishing Plants…………..etc.
• Design, Install, Commission, Operate and maintain wastewater treatment plant (Domestic
& Industrial) such as: Extended aeration, conventional aeration, Moving Bed Bio-Reactor
(MBBR), Membrane Bio-Reactor (MBR)………………….etc.
• Design, install, commission, operations and maintenance seawater treatment facility for
the oil fields water injection.
• Operate and maintain different departments of the cane sugar factory.

January 2013 –
May 2018

Employer: TISS Electromechnical Company.
Employer Address: Abu Dhabi – UAE.
Job title: Project Manager.

Job Description

• Prepare site survey of the projects.
• Study the tender Documents, evaluate specifications.
• Prepare design and P&ID’s for different type of the treatment plant as per project
requirements.
• Select the major equipment, analyzers according to the project requirements.
• Prepare material requisition and support procurement department..
• Prepare Pricing spread sheet, cost estimation.
• Prepare techno-commercial proposal according to the project requirements.
• Follow-up with the client about quotation and negotiation.
• Prepare strategy and schedule/plan for all project construction works from early works until
project handing over.
• Develop the process design to be more competitive with the market and competitors.
• Execute the project successfully as per and within the contractual requirements and
standards.
• Make quality control of the final treated effluent within the acceptable limits as per the
Specifications given in the standards proposal.
• Lead the operators for effective and efficient operation of the plant.
• Co-ordinate with the executive and managing director for all the activities and plans related to
develop the business and market needing.

• Prepare Maintenance schedule according to the vendor requirements.
• Operate the water treatment plant according to the standards of commonly used processes
such as {MBBR, SBR, Conventional plug flow and extended aeration}.
• Co-ordinate with all discipline engineers for all maintenance schedule and jobs in the plant.
• To conduct various experiments in the Influent and Effluent along with lab technicians.
• To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the
concerned authority.

Reference
Projects

Project: Common Seawater Supply Project.
Application: Water injection for the oil fields.
Capacity: 2000 cubic meter per day.
Location: Khor Al Zubair – Basrah – Iraq.
Client: BOC (Basra Oil Company at IRAQ).
Consultant: CH2MHILL.
EPC Contractor: TISS Electromechnical Company. Contract
Duration: 3 years
The project objective:
The objective of the project is to develop a technical solution to implement a Common Seawater
Treatment Facility (STF) for the Zubair, Rumaila, West Qurna 1, West Qurna 2, and Majnoon oil
fields in Southern Iraq. Each of these oil fields required water injection to ensure proper oil
reservoir maintenance and maximize oil recovery.
The scope of work:
Plan, design, procure, construct, and operate a demonstration facility to validate design criteria
and confirm the selected treatment system can successfully achieve the stated water quality
goals.
Project: Treated Sewage Effluent (TSE) Polishing Plant.
Application: Water supply for district Cooling Plant.
Capacity: 6600 cubic meter per day.
Location: Lusail Marina Phase # 1 – Doha – Qatar.
Client: Marafeq – Qatar.
EPC Contractor: BUTEC / ADC – Energy System Abu Dhabi.
Sub-Contractor: TISS – Electromechanical Company.
Contract Duration: 18 Month.
The project objective:
Due to scarcity of water resources in the Gulf countries and the world, most of the GCC
countries tended to use treated sewage effluent (TSE) as an alternative to drinking water in the
district cooling plant. So The project objective is to develop the process design concepts for
TSE-Polishing plant shall be installed to meet water quality required by district cooling plant.
The scope of work:
Plan,design, procure, construct, install and commission a polishing plant (capacity=6,600 m3
/day)
which include ultra-filtration (UF) and reverse osmosis (RO) with all related equipments.

March 2012 –
January 2013

Employer: Kadhema Scientific Consultancy and Service (KSCS) Co.
Employer Address: Kuwait State.
Job title: Senior Process Engineer.

Job Description

• To prepare the site survey of the projects and study tender documents and approved the total
tender specifications.
• To make and prepare the suitable calculations and specification for the all wastewater
treatment plant equipments.

• To prepare the techno-commercial proposal and calculate the total cost, installation cost and
commissioning cost.
• To follow-up with the client about the quotation and negotiation about it.
• To develop the plant process and equipments capacity and models to be able and more
competitive with the market competitors.
• To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended aeration
successfully as per and within the contractual requirement and standards process.
• To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the standards proposal.
• To Guide the Process personnel for effective and efficient operation of the plant.
• To Co-ordinate with the Project Manager for all the activities related to the development of
the Process.
• To maintain and calculate mass balance and sludge (SRT) in typically design parameters for
commonly used processes such as {MBBR, SBR, Conventional plug flow and extended
aeration}.
• To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the
designing standards.
• To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
• To conduct various experiments in the Influent and Effluent along with lab technicians.
• To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the
concerned authority.

Reference
Projects

Project: Industrial wastewater Treatment Plant with capacity = 2500 m3
/day.

Location: Subhan industrial area – Kuwait city – Kuwait.
Client: PEPSI-COLA Kuwait.
EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.
The project objective:
The objective of the project is to treat the industrial wastewater produced from beverage
factories using Sequence Batch Reactors (SBR) technology to meet the criteria of the treated
wastewater discharged into the sewerage system.
The scope of work:
Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m3

/day and all related equipments.

Project: Industrial wastewater Treatment Plant with capacity = 1500 m3
/day.

Location: Subhan industrial area – Kuwait city – Kuwait.
Client: AMERICANA – Kuwait.
EPC Contractor: Kadhema Scientific Consultancy and Service (KSCS) Co.
The project objective:
The objective of the project is to treat the industrial wastewater produced from Bakeries and
Meat factories using Dissolved air flotation (DAF) technology with extended aeration system to
meet the criteria of the treated wastewater discharged into the sewerage system.
The scope of work:

Plan, design, procure, construct, install and commission wastewater treatment plant with
capacity 2500 m3

/day and all related equipments.

July 2008-
March 2012

Employer: KCC Engineering and contracting company (KCCEC) Employer
Address: Kuwait State.
Job title: Senior Process Engineer

Job Description

• To Execute Operation and Process of the Project No. SE / S / 137 and Project
No.:SE/S/128. Successfully as per and within the contractual requirement.
• To Organize the Process as per Plant requirements and scheduling the daily activities.
• To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the Contract by the Ministry.

• To Guide the Process personnel for effective and efficient operation of the plant.
• To Co-ordinate with the Project Manager and MPW for all the activities related to the
development of the Process.
• To maintain and calculate mass balance and sludge (SRT).
• To maintain and calculate (HRT) for aeration and clarifiers basins.
• To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
• To conduct various experiments in the Influent and Effluent along with MPW lab personnel.
• To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the
concerned authority.
• To carry out the Treatment of Thickened Sludge and Operation of Belt Press Equipments
using high quality Cationic Polymers.
• To arrange the Disposal of Waste Sludge Out side the Plant.
• To prepare Internal Work Orders and Request for Inspection, and submit to the Ministry for
approval.
• To Co-ordinate with Plant Services manpower for Land Scaping & Irrigation works and
maintains the Plant area Clean & Green.
• To Co-ordinate with Safety Officer and take utmost care towards safety of the Work Force.
• To Co-ordinate with Instrumentation Engineer for Calibration of Flow measuring devices as
per the Preventive Maintenance Schedule.
• To Co-ordinate with Project Manager for preparing Monthly payment bill and getting monthly
work orders from Ministry of Public Works.

• To Co-ordinate with our inside and outside supplier for getting chemicals and materials
required for wastewater treatment plant and laboratory tests.

Reference
Projects

Project: Al JAHRA wastewater treatment plant (Capacity= 120,000 m3
/day).

Location: Amgarah area – Jahra city – Kuwait.
Client: Ministry of Public Work (MPW) – Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and attached
activated sludge according to the design standards and criteria of the treated sewage effluent
used in irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 120,000 m3
/day.
Project: Al REKKA wastewater treatment plant (Capacity= 250,000 m3
/day).

Location: AL AHMADI city – Kuwait.
Client: Ministry of Public Work (MPW) – Kuwait.
EPC Contractor: KCC Engineering and contracting company.
The project objective:
Operate and maintain the sewage treatment plant using extended aeration system and attached
activated sludge according to the design standards and criteria of treated wastewater used in
irrigation.
The scope of work:
Operate and maintain wastewater treatment plant with capacity 250,000 m3
/day.

Nov.2004 – July
2008

Employer: Egyptian Sugar and Integrated Industrial company (ESIIC) Employer
Address: Giza, Egypt.
Job title: Process Engineer.

Job Description

• In charge for Operation and Maintenance of sulfur Dioxide production plant.
• In charge for Operation and Maintenance of milk of lime (Calcium Hydroxide) production
plant.
• In charge for operation of raw and mixed Juice extraction (by mills & diffuser) plant.
• In charge for operate and maintenance of raw and mixed cane Juice treatment plant
(chemicals & thermal treatment).

• In charge for Juice clarifier plant and Mud of juice filtration plant.
• In charge for Juice evaporation plant and concentrated syrup production.
• To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the
concerned authority.
• To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
• To Co-ordinate and contact with our inside and outside supply of materials required for all
production processes.
• To Co-ordinate with factory and other work shop for repairing and maintenance our
equipments required in our factory processes.
• To maintain and calculate mass and energy balance for cane sugar factory.
• To maintain and calculate Capacity of all our equipments in cane sugar factory.

Reference
Projects

Project: Qus Cane Sugar Factory.
Location: Qus city – QENA Governorate – Egypt
Owner: Egyptian Sugar and Integrated Industrial company (ESIIC).
The project objective:
The project objective to produce white or brown sugar from cane sugar using sugar factory with
capacity of 1500 ton of white/brown sugar and bi-products such as Molasses and Bagasse.
The scope of work:
Operate and maintain cane sugar factory to produce white/brown sugar according to the design
criteria and equipment datasheet.

May 2000 – Oct.
2004

Employer: SYSTEM TECHNIQUE – Water Management.
Employer Address: Giza, Egypt.
Job title: Operation and Process Engineer.

Job Description

• To prepare the site survey of the projects and study tender documents and approved the total
tender specifications.
• To make and prepare the suitable calculations and specification for the all wastewater
treatment plant equipments.
• To prepare the techno-commercial proposal and calculate the total cost, installation cost and
commissioning cost.
• To follow-up with the client about the quotation and negotiation about it.
• To develop the plant process and equipments capacity and models to be able and more
competitive with the market competitors.
• To Execute Operation / Process of the plant (MBBR, SBR, Conventional, extended aeration
successfully as per and within the contractual requirement and standards process.
• To Maintain the Quality of the Treated Effluent within the acceptable limits as per the
Specifications given in the standards proposal.
• To Guide the Process personnel for effective and efficient operation of the plant.
• To Co-ordinate with the Project Manager for all the activities related to the development of the
Process.
• To maintain and calculate mass balance and sludge (SRT) in typically design parameters for
commonly used processes such as {MBBR, SBR, Conventional plug flow and extended
aeration}.
• To maintain and calculate (HRT) for aeration and clarifiers basins in the standards of the
designing standards.
• To Co-ordinate with all discipline engineers for all maintenance jobs in the plant.
• To conduct various experiments in the Influent and Effluent along with lab technicians. Article Sponsored Find something for everyone in our collection of colourful, bright and stylish socks. Buy individually or in bundles to add color to your sock drawer!
• To prepare all the Periodical reports like Daily, Weekly, Monthly & Yearly and submit it to the
concerned authority.

Reference
Projects

Project: Reverse Osmosis (RO) plant with capacity 2,000 m3
/day.

Location: SONESTA Beach resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: SONESTA Resorts and Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,000 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.

Project: Reverse Osmosis (RO) plant with capacity 1,500 m3
/day.

Location: HYATT REGENCY resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: HYATT REGENCY Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 1,500 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 2,500 m3
/day.

Location: Mövenpick Resorts – Sharm El Sheikh City – South Sinai Gov. – Egypt.
Client: Mövenpick Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 2,500 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.
Project: Reverse Osmosis (RO) plant with capacity 800 m3
/day.
Location: HYATT REGENCY resorts – Taba City – South Sinai Gov. – Egypt.
Client: HYATT REGENCY Hotels – Egypt.
EPC Contractor: SYSTEM TECHNIQUE company, Egypt.
The project objective:
Due to scarcity of water resources in South Sinai Governorate-Egypt, most of the resorts and
hotels tended to use treated seawater as drinking water source. So The project objective is to
design and install RO plant to treat seawater and meet drinking water criteria and limits.
The scope of work:
Design, Supply, Operate and maintain Reverse Osmosis (RO) plant (capacity 800 m3
/day)
according to the design standards and criteria of treated seawater used in drinking and other
applications.

Educational
Details
B.Sc. Of
Chemical

1999 South Valley university, Egypt. First Class (72.5%)

Target Job
Job location Any Country
Job
Category Process and Operation for Water / Waste Water Treatment plants.
Employment
Type

Permanent / Contract.

Employment
Status Full Time
Current
location

Egypt

Driving
License

UAE driving license (Valid upto: 2022)

Computer
skills

1. Microsoft Office.
2. AUTO CAD.

Significant
Skills

• Excellent Team Work and Technical Support.
• Good Analytical, Organizational and Interpersonal Skills.
• Good Leadership, People Management, self motivation & negotiating Skills
• Highly disciplined work habits, Dedication towards work & commitments
• Accurate planning and completion of the work schedule in time
• Excellent English Language and Presentation Skills

Languages
Known English, Arabic.

Up-Date: