This project, carried out for National Housing Company (KAS), involves the supply and installation of a 10,000 m³/day water treatment plant for the Industrial Valley in Murcia.

The project aims to provide an efficient and reliable water treatment solution to meet the water requirements of the Industrial Valley. The works include the supply, installation, integration, testing, and commissioning of the treatment plant and its associated mechanical, electrical, and control systems.

Scope of Work

The project encompasses the supply and installation of the water treatment plant, including:

  • Supply and installation of water treatment equipment and process units.
  • Installation of pumps, tanks, piping, valves, and associated mechanical equipment.
  • Installation of electrical power systems, control panels, cabling, and earthing.
  • Installation of instrumentation, automation, and monitoring systems.
  • Integration of treatment units with pumping and auxiliary systems.
  • Testing, pre-commissioning, commissioning, and performance verification.
  • Inspection and quality control of installed equipment and systems.
  • Coordination with civil, MEP, and other project interfaces.
  • Preparation of technical, testing, and commissioning documentation.
  • Compliance with project specifications, quality standards, and HSE requirements.

Technological Impact

The project enhances the Industrial Valley’s water treatment infrastructure through the implementation of a high-capacity 10,000 m³/day treatment plant.

The integration of modern treatment equipment, pumping systems, instrumentation, and automated controls improves water quality, operational reliability, and process efficiency while supporting sustainable water management and the growing water requirements of the industrial area.