Home / Projects / Completed Projects / Operation and Maintenance of Main Sewage Pumping Station in New Cairo City

Operation and Maintenance of Main Sewage Pumping Station in New Cairo City

Project Overview

This project, undertaken for the New Urban Communities Authority, involves the comprehensive operation and maintenance of the Main Sewage Pumping Station in New Cairo City. The project aims to ensure the continuous, efficient, and reliable operation of the main wastewater pumping infrastructure, supporting the effective conveyance of sewage flows to treatment facilities while maintaining compliance with environmental, operational, and safety standards.

The project focuses on maintaining the availability and performance of critical pumping assets through professional operation, preventive maintenance, corrective actions, and technical management practices. It contributes to enhancing the sustainability and reliability of the wastewater infrastructure serving New Cairo City.

Scope of Work

The project encompasses comprehensive operation and maintenance activities for the Main Sewage Pumping Station, including:

  • Continuous operation and monitoring of the main sewage pumping station and associated facilities.
  • Preventive, predictive, and corrective maintenance of pumps, motors, valves, generators, electrical panels, mechanical equipment, and electromechanical systems.
  • Operation and maintenance of pumping units, wet wells, dry wells, rising mains, collection chambers, and auxiliary systems.
  • Inspection, cleaning, and maintenance of sewage channels, pipelines, valves, tanks, and related hydraulic structures.
  • Operation and maintenance of SCADA, instrumentation, automation, and control systems where applicable.
  • Monitoring sewage flow rates, water levels, pressure readings, and equipment performance indicators to ensure efficient wastewater conveyance.
  • Conducting regular inspections, performance evaluations, and troubleshooting of equipment and systems.
  • Implementing emergency response procedures and corrective maintenance to minimise operational interruptions.
  • Managing spare parts, assessing equipment conditions, and replacing deteriorated components when required.
  • Preparing operation and maintenance plans, reports, records, and technical documentation according to New Urban Communities Authority requirements.
  • Ensuring compliance with occupational health, safety, and environmental (HSE) standards throughout all project activities.

Technological Impact

The project improves the efficiency, reliability, and sustainability of the wastewater conveyance system in New Cairo City through the application of modern operation and maintenance technologies. The integration of SCADA systems, real-time monitoring, automated control solutions, predictive maintenance strategies, and digital asset management enhances operational visibility, supports early fault detection, and optimises the performance of the main sewage pumping station.

Through improved maintenance practices and technical management, the project contributes to reducing operational downtime, improving energy efficiency, extending equipment service life, and increasing the reliability of wastewater services. The project also supports knowledge development among operation and maintenance teams, ensuring sustainable and effective management of New Cairo City's wastewater infrastructure.