Project Overview
This project, carried out for the Royal Saudi Strategic Missile Force, involves the supply and installation of a SCADA control panel for the desalination plant and level measurement equipment for overhead water tanks at Site No. 6 in Riyadh.
The project aims to enhance the monitoring, control, and operational efficiency of the desalination plant and water storage facilities through the implementation of advanced automation and instrumentation systems. It includes the installation, integration, testing, and commissioning of SCADA, control panels, level measurement devices, and associated electrical and control systems.
The project supports reliable water management operations by improving real-time monitoring capabilities, optimising plant performance, and ensuring accurate control of water production and storage levels in accordance with operational requirements and technical standards.
Scope of Work
The project encompasses the supply and installation of SCADA and instrumentation systems, including:
- Supply, installation, and commissioning of the SCADA control panel for the desalination plant.
- Integration of the SCADA system with existing plant equipment and control systems.
- Installation of programmable logic controllers (PLCs), control modules, communication interfaces, and related automation components.
- Installation of level measurement equipment for overhead water storage tanks.
- Installation of sensors, transmitters, cables, junction boxes, and associated instrumentation systems.
- Electrical wiring, cable termination, testing, and commissioning of control and monitoring systems.
- Configuration and programming of SCADA screens, alarms, data logging, and operational monitoring functions.
- Integration of real-time monitoring and control functions for desalination plant operations.
- Testing, calibration, and verification of level measurement devices and instrumentation accuracy.
- Troubleshooting and technical support during installation and commissioning phases.
- Preparation of technical documentation, equipment manuals, testing reports, and commissioning records.
- Ensuring compliance with occupational health, safety, and environmental (HSE) requirements throughout project execution.
Technological Impact
The project enhances the operational reliability and efficiency of the desalination plant and water storage facilities through the implementation of modern SCADA and instrumentation technologies. The upgraded monitoring and control systems enable real-time supervision, accurate water level management, improved fault detection, and faster response to operational conditions.
The project contributes to optimising water resource management, reducing operational risks, improving system availability, and enhancing maintenance efficiency. It supports the adoption of advanced automation solutions for critical water infrastructure while ensuring reliable and secure operation at the Royal Saudi Strategic Missile Force facilities.