Project Overview
This project, carried out for Saudi Energy (SE), involves the rehabilitation of the Combined Cycle Water Treatment Plant and the Building Ventilation System at the 10th Energy Power Plant.
The project aims to improve the operational efficiency, reliability, and performance of existing water treatment and ventilation systems through comprehensive rehabilitation and upgrading works. It includes the refurbishment of mechanical, electrical, instrumentation, and control systems to ensure continuous and efficient operation of the power plant facilities.
The project supports sustainable power generation operations by enhancing water treatment capabilities, improving indoor environmental conditions, extending equipment service life, and ensuring compliance with technical specifications, safety requirements, and operational standards.
Scope of Work
The project encompasses comprehensive rehabilitation works for the Combined Cycle Water Treatment Plant and Building Ventilation System, including:
- Assessment of existing systems and identification of required rehabilitation and upgrading works.
- Rehabilitation and improvement of water treatment plant units and associated equipment.
- Refurbishment of mechanical equipment, including pumps, motors, valves, piping systems, filtration units, and auxiliary equipment.
- Rehabilitation and upgrading of electrical systems, control panels, instrumentation, and automation systems.
- Inspection, maintenance, and replacement of damaged or obsolete components to improve system performance.
- Rehabilitation of building ventilation systems, including air handling units, ventilation fans, ductwork, filters, dampers, and associated control systems.
- Testing and commissioning of rehabilitated water treatment and ventilation systems.
- Performance verification to ensure systems meet operational requirements and design specifications.
- Troubleshooting and technical support during rehabilitation and commissioning phases.
- Preparation of technical documentation, rehabilitation records, testing reports, and commissioning documents.
- Ensuring compliance with occupational health, safety, and environmental (HSE) requirements throughout project execution.
Technological Impact
The project enhances the reliability and efficiency of the 10th Energy Power Plant by implementing modern rehabilitation solutions for critical water treatment and ventilation systems. Upgraded mechanical equipment, improved control systems, and enhanced monitoring capabilities contribute to better operational stability, reduced failures, and improved energy efficiency.
The rehabilitation works support sustainable power generation by extending the service life of existing assets, optimising plant performance, improving operational safety, and ensuring reliable operation of essential utility systems in accordance with Saudi Energy standards and international engineering practices.